Board report
Status, risks, budget and decisions from short plain lines, laid out like a designed report.
What it shows
Write a board report from blocks that draw themselves.
What you learn
A title band, headline numbers, red-amber-green status, key facts beside the text, a cost bridge, a risk register with its heat map, a weighted choice, a roadmap, stages, an agenda and a sign-off.
Try this
- Change
Roof and solar panels: amber, slippingtoRoof and solar panels: red, slipping, and its row and the bar above it turn red. - Change
Bats return to the old block: unlikely, majortoBats return to the old block: likely, major, and its dot climbs the heat map.
Where the project stands
Summary
The frame is going up on time, and the school will open the new block in September 2027 as planned. The forecast cost is £4.67M, £66k over the contract sum. The trust's contingency covers it with £184k to spare.
One workstream needs the board. The supplier of the roof's solar panels went into administration in October, and the frame cannot be closed in without a roof. The board is asked to approve a second supplier (section 5) and to note the risks in section 4.
The money
The contract sum is £4.60M at a fixed price. Changes since April are paid from the trust's contingency of £250k.
Risks
Two risks have come down since September because of work already paid for. The grid connection is the one to watch: without it the heat pumps cannot run.
Choosing a second solar supplier
Three firms quoted. Delivery matters most: the roof has to be closed by March, or the fit-out moves into the summer and the opening slips.
The plan from here
How the school moves in, once the contractor hands over:
The next meeting
Sign-off
About this example
How it's made
Every picture in this report is a few plain lines in a fenced block, and a rule in the rules block names the plugin that draws it. The status table is seven lines, and the heat map six.
Change a word like amber or likely, and the picture follows. Open the Source to see each block next to what it draws.
set style paper numbered gives the sheet and numbers the ## headings, so the text can point to "section 5". The # heading above starts the numbers again.
Try it yourself
- Write
= Left: £184kin place of= Leftin the money block. The block checks the sum and says it matches. - In the supplier scores, move the
*from Brightwell Solar to Sunfield UK. The block says Sunfield is chosen, though Brightwell scores higher. - In the agenda, change the
20 minafterThis reportto30 min. Every start time after it moves on ten minutes. - Put
[x]beforePackin the moving-in stages. Its disc fills with a tick, and the stages after it show as still to come. - Add
2 December 2026afterHead teacher, Hollins Parkin the sign-off. That slot shows as signed.
Next: Printable checklist prints a form to fill in with a pen; Sales dashboard draws its charts from a list of orders.
~~~ selfscribe
# Lesson: Write a board report from blocks that draw themselves.
# You learn: a title band, headline numbers, red-amber-green status, key facts beside the text, a cost bridge, a risk register with its heat map, a weighted choice, a roadmap, stages, an agenda and a sign-off.
# Try this: change `Roof and solar panels: amber, slipping` to `Roof and solar panels: red, slipping`, and its row and the bar above it turn red.
# Try this: change `Bats return to the old block: unlikely, major` to `Bats return to the old block: likely, major`, and its dot climbs the heat map.
# summary: Status, risks, budget and decisions from short plain lines, laid out like a designed report.
# category: writing
# tags: document, advanced, work
# uses: chart, timeline, print
use markdown
set title Board report
set page A4 portrait margins normal
# paper is the look; numbered numbers the ## headings, so the text can say "section 5".
set style paper numbered
# ---- Each block below is a plugin: you write a few plain lines, and it draws the picture.
# ---- ```cover``` a title: title, subtitle, then "Label: value" lines; "banner" sets it on a band.
block ``` cover ... ``` -> cover verbatim
# ---- ```stats``` headline tiles: "Name: value | change | note | trend".
block ``` stats ... ``` -> stats verbatim
# ---- ```status``` one workstream a line: "Name: green, amber or red | what is going on | owner".
block ``` status ... ``` -> status verbatim
# ---- ```facts``` a panel of "Label: value" facts; "aside" sets it beside the text.
block ``` facts ... ``` -> facts verbatim
# ---- ```waterfall``` a start, steps down and up, and "= Total" where they end.
block ``` waterfall ... ``` -> waterfall verbatim
# ---- ```risks``` "Risk: likelihood, impact | what is done | owner", with "->" for where it stands now.
block ``` risks ... ``` -> risks verbatim
# ---- ```score``` options scored against weighted criteria; "*" marks the one chosen.
block ``` score ... ``` -> score verbatim
# ---- ```horizons``` a roadmap: a heading ending in a colon starts a column, each line under it is a card.
block ``` horizons ... ``` -> horizons verbatim
# ---- ```steps``` a process in stages: "Name | what happens | how long".
block ``` steps ... ``` -> steps verbatim
# ---- ```agenda``` a meeting's items; each start time is worked out from "starts" and the lengths.
block ``` agenda ... ``` -> agenda verbatim
# ---- ```approvals``` who prepared, reviewed and approved: "Role: Name | title | date".
block ``` approvals ... ``` -> approvals verbatim
~~~
```cover
banner
New science and arts block
Hollins Park School · report to the Ashgrove Learning Trust board
Prepared by: Carver Allen, project managers
Date: 20 November 2026
Confidential
```
## Where the project stands
```stats
Spent to date: £1.92M | of £4.67M forecast | 0.21 0.58 1.07 1.48 1.92
Built: 41% | +17% | since September | 8 14 24 41
Contingency left: £184k | -£66k bad | of £250k
> Opening: September 2027 | on time
```
```status
Groundworks and drainage: done | handed over on 2 October | Pennine Build
Timber frame: green, improving | ground floor up; first floor from 30 November | Pennine Build
Roof and solar panels: amber, slipping | the panel supplier went into administration | Dan Whitlock
Heat pumps: amber, steady | grid connection date not yet confirmed | Aisha Rahman
Science labs: green | gas and fume cupboards designed and priced | Dan Whitlock
Planning conditions: green | bat survey signed off in October | Aisha Rahman
Moving classes in: not started | over the summer holiday 2027 | Joanne Hale
=> Two workstreams amber, none red. The board is asked to choose a second solar supplier (section 5).
```
## Summary
```facts
# At a glance
aside
School: Hollins Park, 1,140 pupils
Building: 6 labs, 4 art rooms, a gallery
> Contract: £4.60M | fixed price
Started: April 2026
Opens: September 2027
Contractor: Pennine Build
```
The frame is going up on time, and the school will open the new block in September 2027 as planned. The forecast cost is £4.67M, £66k over the contract sum. The trust's contingency covers it with £184k to spare.
One workstream needs the board. The supplier of the roof's solar panels went into administration in October, and the frame cannot be closed in without a roof. The board is asked to approve a second supplier (section 5) and to note the risks in section 4.
## The money
The contract sum is £4.60M at a fixed price. Changes since April are paid from the trust's contingency of £250k.
```waterfall
# Where the contingency has gone
Contingency at the start: £250k
Poor ground under the art rooms: -£72k
Bat boxes and a later demolition: -£18k
Cheaper cladding, same look: +£55k
> Second solar supplier: -£31k | if the board approves it
= Left
```
## Risks
Two risks have come down since September because of work already paid for. The grid connection is the one to watch: without it the heat pumps cannot run.
```risks
Solar panels arrive late: likely, major -> possible, minor | second supplier, see section 5 | Dan Whitlock
Grid connection comes after opening: possible, severe | a hired boiler is priced as a fallback | Aisha Rahman
Winter weather stops the frame: likely, moderate | frame wrapped; two weeks of float in the plan | Pennine Build
Bats return to the old block: unlikely, major -> rare, major | bat boxes up; demolition outside the roosting season | Aisha Rahman
Lab gas fails its first inspection: rare, severe | specialist checks at first fix | Dan Whitlock
Complaints from Coppice Lane: likely, minor | no deliveries before 8 am; a letter to every house | Joanne Hale
```
## Choosing a second solar supplier
Three firms quoted. Delivery matters most: the roof has to be closed by March, or the fit-out moves into the summer and the opening slips.
```score
| *Brightwell Solar | Northgate Energy | Sunfield UK
Price (weight 2): 3 | 5 | 4
Delivery by February (weight 4): 5 | 2 | 4
Warranty (weight 3): 5 | 3 | 4
Has fitted school roofs before (weight 2): 5 | 2 | 3
=> Brightwell Solar: the only one with panels in stock in the UK, and a 25-year warranty.
```
## The plan from here
```horizons
Autumn 2026:
[x] Groundworks and drainage
[>] Timber frame | Pennine Build
[>] Choose a solar supplier | for decision on 3 December
Spring 2027:
Roof, panels and windows | closed in by March
Heat pumps and labs, first fix
Summer 2027:
Fit-out and furniture
Move classes in | over the holiday | Joanne Hale
September 2027:
Open to pupils | 6 September
```
How the school moves in, once the contractor hands over:
```steps
Pack | each department boxes its rooms in the last week of term | 1 week
Hand over | keys, safety files and a walk round with the contractor | 22 July
Move | removals over two weekends, the labs last | 2 weeks
Set up | computers, gas checks and a fire drill with staff | 1 week
```
## The next meeting
```agenda
# Trust board, 3 December 2026
starts 16:00
Welcome and apologies | Chair | 5 min
This report | Dan Whitlock | 20 min
> Second solar supplier | Dan Whitlock | 15 min | for decision
Risks and the grid connection | Aisha Rahman | 15 min
Break | 10 min
Moving classes in | Joanne Hale | 15 min
Any other business | 10 min
```
## Sign-off
```approvals
Prepared by: Dan Whitlock | Project manager, Carver Allen | 18 November 2026
Reviewed by: Aisha Rahman | Estates director, Ashgrove Learning Trust | 19 November 2026
Approved by: Joanne Hale | Head teacher, Hollins Park
Received by: | Chair of the trust board
```
---page---
# About this example
## How it's made
Every picture in this report is a few plain lines in a fenced block, and a rule in the rules block names the plugin that draws it. The status table is seven lines, and the heat map six.
Change a word like `amber` or `likely`, and the picture follows. Open the Source to see each block next to what it draws.
`set style paper numbered` gives the sheet and numbers the `##` headings, so the text can point to "section 5". The `#` heading above starts the numbers again.
## Try it yourself
1. Write `= Left: £184k` in place of `= Left` in the money block. The block checks the sum and says it matches.
2. In the supplier scores, move the `*` from Brightwell Solar to Sunfield UK. The block says Sunfield is chosen, though Brightwell scores higher.
3. In the agenda, change the `20 min` after `This report` to `30 min`. Every start time after it moves on ten minutes.
4. Put `[x]` before `Pack` in the moving-in stages. Its disc fills with a tick, and the stages after it show as still to come.
5. Add `2 December 2026` after `Head teacher, Hollins Park` in the sign-off. That slot shows as signed.
Next: *Printable checklist* prints a form to fill in with a pen; *Sales dashboard* draws its charts from a list of orders.